What needed to be solved
The client required a complete electrical infrastructure system for a new table-water production facility in Abuja. The installation needed to support production equipment, water-treatment systems, packaging machinery, lighting, administrative areas and other auxiliary loads while providing reliable standby power for continuous factory operations.
