What needed to be solved
The facility required a robust, high capacity electrical infrastructure built from scratch to power an intensive, commercial-grade kitchen operation. The client faced critical challenges, including high inductive loads from 3-phase motors, severe thermal build up requiring high-capacity exhaust systems, potential phase imbalances, and strict safety hazards inherent to high moisture, high-heat cooking environments.
